PAST AND CURRENT PROJECTS
Mason Park Master Plan Booklet and Cost Estimate
Mason Park Master Plan Booklet and Cost Estimate The master plan update for Mason Park began with an assessment of the current park amenities and an inventory of programs and activities provided within the vicinity of Mason Park. This included review of the 2016 Building Assessment on the community center and the 2014 [...]
Eastwood Park Master Plan and Cost Estimate
Eastwood Park Master Plan and Cost Estimate In 1916, the City of Houston acquired a 10.8-acre site on Harrisburg Boulevard to establish Eastwood Park. The park underwent extensive renovation in the 1970s, including repairs and additions to the community center, construction of a swimming pool, renovation of the existing ball field, construction of [...]
Sidewalk Condition Assessment Study
Sidewalk Condition Assessment Study Sidewalks form the basis for vibrant, healthy, walkable communities. Sidewalk conditions in the Tax Increment Reinvestment Zone (TIRZ 23) area vary widely. Some corridors have substantial, high- quality pedestrian infrastructure, while others have aging or inaccessible sidewalks. Several streets lack any type of sidewalk leaving gaps in the network. The [...]
Buffalo Bayou East Master Plan
Buffalo Bayou East Master Plan Buffalo Bayou East brings the community’s vision for its waterfront to life, building from a rich history and refined through a comprehensive master planning process. The PDF presents the many integral pieces that drive this vision, integrating new open spaces and trails, dynamic waterfront destinations, and connections to surrounding [...]
Existing Conditions and Needs Analysis
Existing Conditions and Needs Analysis Project Plans Maps Downloads Existing Conditions and Needs Analysis (PDF)